top of page

UC Merced Health & Wellness

Merced, California

Taylor Engineers' project at the Joseph Edward Gallo Recreation and Wellness Center includes the plan and sec for a gymnasium, multipurpose room, weight room, locker room, administrative office, and wellness clinic. After working with Taylor Engineers this building received NC Gold LEED Certification

The HVAC system operates via an advanced VAV Reheat system that is aided by boilers and central plan chilled water. This system provides stable and energy efficient climate control for the multi-use facility.

Size (ft²)

35,000

Stories

N/A

Project Type

Education

Scope of Work

Full plans & spec of HVAC and DDC control system with high efficiency mechanical system, commissioning

Completed

2007

Owner

University of California, Merced

Architect

Sasaki Associates, Inc.

Contractors

General: Howard S. Wright Construction Company
Mechanical: Bangar Mechanical

Photographer

Tim Griffith

References

UCM: Michael Chow
Sasaki: Evan Jacob

Download this page as a PDF
bottom of page