top of page
Workday Development Center
Pleasanton, California
The Workday Development Center is a new 6 story office building totaling 413,000 ft2 with a 160,000 ft2 underground garage and a 400,000 ft2 above-grade garage.
The mechanical design consists of high performance VAV systems served by an all-variable speed chilled water plant with magnetic bearing chillers and variable primary distribution. Heating is provided by condensing boilers with variable speed pumping.
Size (ft²)
413,000
Stories
6
Project Type
Office
Scope of Work
Full design of core & shell HVAC, plumbing, and BAS systems
Completed
2018
Owner
Workday
Architect
Gensler
Contractors
GC: DPR
MC: CMI
BAS: Sunbelt
Photographer
N/A
References
Terrasset: Greg Thurman
Gensler: Philip Kaefer
CMI: Brian Coday
Download this page as a PDF
bottom of page